This is one of our own developments. In 2020 we took on a plot in Eastleigh with a tired old bungalow on it, and over the next eight months we replaced it with a pair of brand-new semi-detached family homes. Each has three bedrooms, two bathrooms and a separate laundry room. We built them, finished them and sold them both. Here is the story, told through the photos we took on site.

Before and after

The old bungalow on the plot in Eastleigh before work started
Before: the old bungalow, summer 2020
The finished pair of three-bedroom semi-detached homes in Eastleigh
After: two new three-bedroom homes, spring 2021

1. Hoarding up, site cleared

The first job on any site is making it safe and secure. Hoarding went up along the road, then the old bungalow was taken down and the plot was cleared, ready for the diggers.

Site hoarding going up in front of the old bungalow
Site hoarding going up in front of the old bungalow
The plot cleared, with the digger ready for groundworks
The plot cleared, with the digger ready for groundworks

2. Foundations

With the site clear, the footings for both houses were dug and concreted. It is the part of the build nobody sees once it is finished, but it is where the quality starts.

Foundations dug and concreted
Foundations dug and concreted

3. Ground floor and walls

Next came the ground floor, then the walls. The inner walls are built in block and the outside in facing brick, rising together course by course, with the door and window openings formed as we go.

Ground floor laid and the first blockwork going up
Ground floor laid and the first blockwork going up
Our team building up the blockwork walls
Our team building up the blockwork walls
Close-up of the facing brickwork
We chose a warm, multi-toned facing brick for the outside

4. First floor and roof

With the scaffolding up, the first floor went on and the upstairs walls were built to full height. Then the roof trusses were lifted into place and fixed, and once the roof was on, the houses were weathertight and work could carry on inside.

Scaffolding up and the first floor under way
Scaffolding up and the first floor under way
Roof trusses going on behind our Maidanbuild site hoarding
Roof trusses going on behind our Maidanbuild site hoarding

5. Finishing touches

With the windows in and the inside finished, we moved outside: new fencing, block paving and planted front gardens with curved brick walls, so the homes were ready to live in from the day they were sold.

The two new homes taking shape, with the windows in
The two new homes taking shape, with the windows in
A new planted front garden with a curved brick wall
A new planted front garden with a curved brick wall

The finished homes

  • A pair of semi-detached family homes in Eastleigh
  • Three bedrooms and two bathrooms in each
  • A separate laundry room in each
  • New fencing, paving and landscaped front gardens
  • From old bungalow to finished homes in about eight months (July 2020 to March 2021)

Want to see another of our builds? Read the story of four new flats in Hampshire, with a time-lapse of the whole build.

Got a plot, or thinking about a new build?

Whether it is a single home or a small development, we manage the whole job from groundworks to handover as one family-run team. See our new builds, get in touch or call us on 07788 975194.